Electrical wiring in a country house
after payment (24/7)
(for all gadgets)
(including for Apple and Android)
“Both single-phase and three-phase meters are used to pay for the use of electricity. The consumer must purchase and install a meter, complying with the requirements of the PUEU. At the place where the meter casing is attached there must be a seal with a stamp indicating the period of its inspection. When installing three-phase meters, the seal must be no more than 12 months old, single-phase - no more than 2 years. The appearance of the meters should indicate that they were stored correctly. The cover of the block for connecting the wires is sealed by the service of the network owner when the meter is approved for operation or when it is replaced. The consumer is responsible for the safety and integrity of the meter and the seals on it. The owner of the networks ensures the planned replacement of meters accepted for service within the time limits established by Gosstandart…”Every owner of a summer cottage dreams of turning it into a piece of paradise. And this can only be done by answering all the numerous questions that arise when implementing a development project. How to arrange an alpine slide, a swimming pool with a cascade, a lawn with green vases on the site? Where and how to properly lay paths, make ramps, stairs? What material can be used for this? And in general, where to start? Brochures from the “Building a Dacha” series will help you find answers to these and many other questions.
Data sheet
- Name of the Author
- Илья Мельников Валерьевич
- Language
- Ukrainian